Skip to content

Booksellers & Trade Customers: Sign up for online bulk buying at trade.atlanticbooks.com for wholesale discounts

Booksellers: Create Account on our B2B Portal for wholesale discounts

Parametric Cost Modeling for Buildings

by Donald Parker
Save 35% Save 35%
Current price ₹16,965.00
Original price ₹26,100.00
Original price ₹26,100.00
Original price ₹26,100.00
(-35%)
₹16,965.00
Current price ₹16,965.00

Imported Edition - Ships in 12-14 Days

Free Shipping in India on orders above Rs. 500

Request Bulk Quantity Quote
+91
Book cover type: Hardcover
  • ISBN13: 9781138464599
  • Binding: Hardcover
  • Subject: N/A
  • Publisher: Routledge
  • Publisher Imprint: Routledge
  • Publication Date:
  • Pages: 180
  • Original Price: GBP 200.0
  • Language: English
  • Edition: 1
  • Item Weight: 499 grams
  • BISAC Subject(s): Construction / Estimating

Successful cost management and value engineering in construction is based on accurate and early estimations of cost, and this book is the quickest route to creating a cost plan from scratch. The budgeting system described in this book will help the reader to:

document project scope at a level that provides excellent cost control at design stage

establish the parameters of potential sites before selecting one

determine the amount of financing needed before deciding to bid on a project

make a detailed and robust building project budget

determine the rental rate necessary to see if a building project will be marketable

The technique used is a parametric cost system, not the square foot cost system used by most who quote an up-front building cost. To help calculate the parameter quantities and price them as quantified, this book comes with 5 electronic templates to calculate program scope; i.e. � space, configuration, HVAC loads, plumbing and electrical. It also includes:

the author�s parametric cost database and cost template to prepare the construction estimate

a soft cost template to price out all related program costs, convert them to a monthly cash flow, incorporate financing costs and then reveal the final budget

an operation and maintenance annual cost template to calculate those variable and fixed costs necessary to run the building and then convert the result into the necessary rental rate to capitalize all costs

The spreadsheets, data, advice, and templates, are all introduced through a detailed case study, placing everything in an easy to understand practical context. This will prove an invaluable guide not only for estimators and cost engineers, but also developers, clients, and architects.

Donald E. Parker is an independent building consultant whose long career has included establishing the first value engineering program for the US General Services Administration, managing their nationwide cost estimating program, performing value engineering design review services for the Kingdom of Saudi Arabia, and positions as Executive Vice President of National Government Properties and Senior Vice President of RRP Corp. He is a Fellow of the Society of American Value Engineers International and President of the prestigious Lawrence D. Miles Value Foundation.

Trusted for over 49 years

Family Owned Company

Secure Payment

All Major Credit Cards/Debit Cards/UPI & More Accepted

New & Authentic Products

India's Largest Distributor

Need Support?

Whatsapp Us