Skip to content

Booksellers & Trade Customers: Sign up for online bulk buying at trade.atlanticbooks.com for wholesale discounts

Booksellers: Create Account on our B2B Portal for wholesale discounts

Small Wind Turbine Installation Compatibility Demonstration Methodology

by U. S. Army Corps of Engineers
Save 7% Save 7%
Current price ₹1,184.00
Original price ₹1,270.00
Original price ₹1,270.00
Original price ₹1,270.00
(-7%)
₹1,184.00
Current price ₹1,184.00

Imported Edition - Ships in 18-21 Days

Free Shipping in India on orders above Rs. 500

Request Bulk Quantity Quote
+91
Book cover type: Paperback
  • ISBN13: 9781508902041
  • Binding: Paperback
  • Subject: N/A
  • Publisher: Createspace Independent Publishing Platform
  • Publisher Imprint: Createspace Independent Publishing Platform
  • Publication Date:
  • Pages: 126
  • Original Price: USD 12.95
  • Language: English
  • Edition: N/A
  • Item Weight: 309 grams
  • BISAC Subject(s): Power Resources / Alternative & Renewable

The objective of this project was to assess the compatibility of small wind turbines ( 100 kW) with Army installations, using Fort Drum, New York, for demonstration. Using one 7.7-kW horizontal-axis wind turbine (HAWT) and one 2.9-kW vertical-axis wind turbine (VAWT), we planned to measure radar, acoustic and seismic, turbulence, bird and bat, cold, and icing effects. We also intended to indicate if small wind turbines (SWT), in few and large numbers, are compatible with Army installations. A planned product was the Army's first Unified Facilities Criteria, addressing the installation of small wind turbines at Army facilities, which would guide installation energy managers in understanding the permitting, installation, and performance of VAWTs and HAWTs in a semi-complex environment. This report describes research executed in FY11 in preparation for wind turbine installation and Intensive Operational Periods of measurements that were planned to be conducted in FY12. Research products include preliminary laboratory or limited field radar, seismic-acoustic, turbulence, and bird and bat results to demonstrate methodologies prior to field use, the permitting process and turbine and site selection processes, and the methodologies proposed for determining icing effects. Because of budget cuts experienced by the funding organization, they did not provide project funding after FY11; therefore, this report discusses the tasks and Army deliverable originally planned for FY12 and FY13.

Trusted for over 49 years

Family Owned Company

Secure Payment

All Major Credit Cards/Debit Cards/UPI & More Accepted

New & Authentic Products

India's Largest Distributor

Need Support?

Whatsapp Us